Skip to content

Efficient workshop coverage

Single Girder Overhead Cranes

A practical, economical overhead crane layout for workshops, production bays and routine material handling.

Designed around the application

Capacity, span, headroom, duty, structure, controls and maintenance access are considered together.

Choosing the right crane

The layout follows the work

A single girder overhead crane uses one bridge beam with the hoist travelling below it. The arrangement keeps crane weight and wheel loads down, making it a strong fit for new workshops, extensions and cost-conscious replacement projects.

CraneCert surveys the building, duty and load path before choosing the beam, hoist and control package. The result is a crane designed around the work rather than a catalogue model forced into the bay.

A strong fit for

  • Fabrication and machining bays
  • General manufacturing
  • Stores and maintenance workshops
  • Indoor or suitably specified outdoor duties
Completed yellow overhead crane in a modern machining workshop

The design brief

Six inputs that shape the project

A useful quotation starts with the operating requirement, not just a headline safe working load.

  1. 01

    Safe working load and load characteristics

  2. 02

    Crane span and runway length

  3. 03

    Available headroom and required hook height

  4. 04

    Expected lifts per hour and shift pattern

  5. 05

    Pendant or radio control preference

  6. 06

    Building steelwork and power supply

Configuration options

Specify what improves the job

Option 1

Low-headroom hoists

Recover useful hook height where roof steel, services or door lines restrict the available envelope.

Option 2

Variable-speed control

Smooth acceleration, travel and positioning for delicate loads or busy production areas.

Option 3

Freestanding runway

Independent steelwork where the existing building is unsuitable for crane loads.

Request a survey

Tell us what needs to move

Share what you know. If capacity, span or hook height are still uncertain, we will help establish them during the survey.

Crane details, if known

A crane engineer will respond within one working hour.

Questions, answered

Single Girder Cranes FAQ

When is a single girder crane the right choice?+

It is often the most economical option for light and medium-duty lifting where the required capacity, span and hook height fit a single-beam layout.

Can a single girder crane be installed in an existing building?+

Yes, subject to a structural and dimensional survey. We can use existing runway steel where suitable or design an independent freestanding structure.

Can you include radio control?+

Yes. Pendant, radio remote and variable-speed control packages can be specified around the process and operator visibility.

Free crane planning pack

Scope the job before the first site visit

Get the practical worksheet our engineers use to start a crane conversation: capacity, span, hook height, duty, access, controls and compliance handover.

  • New-crane requirements worksheet
  • Site survey and access checklist
  • Maintenance and LOLER planner
  • Questions to compare quotations
Get the free planning pack Useful for facilities, engineering and production teams.

Planning single girder cranes?

Talk through the load, building and timescale with a CraneCert engineer.